Fahrenheit  
[photo]
cool blue glow as the winter sun goes down
[photo]
skylights
[photo]
penthouse balcony
[photo]
Represent...
[photo]
new sod for the ballpark
[photo]
glass on the southwest corner
[photo]
HVAC
[photo]
west side!
[photo]
blue plastic wrap
[photo]
hvac details
[photo]
hvac
[photo]
new stuffed delivered on to the roof!
[photo]
rooftop mechanicals
[photo]
summer night
[photo]
roof is almost closed off
[photo]
must be working overtime now that there's two port-a-potties...
[photo]
materials cleared off from top of parkade
[photo]
interior framing on the 7th floor
[photo]
starting on the top floor
[photo]
almost done with the 6th floor ceiling
[photo]
6th floor rebar
[photo]
start of 5th floor ceiling
[photo]
start of 5th floor ceiling
[photo]
5th floor interior walls, 4th floor balcony
[photo]
fahrenheit, coronado bridge and petco park
[photo]
cement drying on 5th floor
[photo]
loading materials for the 5th floor
[photo]
christel checking up on the construction
[photo]
christel checking up on the construction, close-up
[photo]
starting on the 4th floor
[photo]
Third floor walls going up.
[photo]
View of the 10th Street Side
[photo]
First floor gets a ceiling.
[photo]
Beginning of 1st floor on 10th street
[photo]
More cranes.
[photo]
More heavy machinery.
[photo]
Starting to pour the foundation
[photo]
some facades completed
[photo]
the grass is greener
[photo]
main structure complete, no grass yet
[photo]
some skin added to smaller, surrounding structures
[photo]
still a bit of a skeleton
[photo]
padres parkade still just a dirt splotch
[photo]
who has the assembly instructions?
[photo]
like an emptied-out bag of legos
Select a page: next | 1 | 2


Hosted by ExposureManager.